Hoffman Estates, IL

hoffman.jpeg
Adjacent to Microsoft, Compass & Aligned, NWC of Rte. 59 & Rte. 72

The Hoffman Estates Data Center Campus is a 185-acre hyperscale development site in Chicago’s established data center availability zone, directly adjacent to Microsoft’s new campus and within a quarter mile of Compass and Aligned Data Centers. The site sits within one of the most supply-constrained Tier I data center markets in the United States, providing immediate scale and proximity to existing hyperscale infrastructure. Hoffman Estates offers one of the largest remaining powered land opportunities in the Chicago market.

Power + Infrastructure

•300+ MW secured through ComEd’s Cluster 2 allocation process
• Transmission Service Agreement currently in execution with Comed
• Target grid delivery in 2030
• 138 kV transmission interconnection under active study

Early Bridge Power

An interstate natural gas pipeline runs through the site, supported by Nicor looped and back-fed service. This configuration supports potential behind-the-meter generation, enabling a bridge-to-grid strategy and potential early operations as soon as 2028.

Strategic Advantages

• 185-acre campus capable of supporting large-scale hyperscale development
• Located within Chicago’s established hyperscale corridor
• Adjacent to Microsoft and near Compass and Aligned campuses
• Immediate access to major long-haul fiber routes within one mile
• Flexible deal structures including land sale, powered land transfer, or joint development

With 300+ MW of transmission-backed power, bridge power optionality, and limited remaining capacity within the ComEd Cluster 2 process, Hoffman Estates represents a time-sensitive opportunity to secure large-scale power in the Chicago data center market.

Interested in this property?

Speak to a developer today

Project Status

Shovel-Ready (12 Months)

Lot Size

185 acres

Natural Gas

Gas line runs through site

Power Capacity

Comed Cluster 2 – TSA in  hand March 2026 – 300 MW starting 2030

Zoning

In progress

Availability

Available (For Sale or JV Development)

Utility

ComEd

Site Advantages

• 300+ MW secured through ComEd’s Cluster 2 allocation process
• Transmission Service Agreement currently in execution with Comed
• Target grid delivery in 2030
• 138 kV transmission interconnection under active study

• 185-acre campus capable of supporting large-scale hyperscale development
• Located within Chicago’s established hyperscale corridor
• Adjacent to Microsoft and near Compass and Aligned campuses
• Immediate access to major long-haul fiber routes within one mile
• Flexible deal structures including land sale, powered land transfer, or joint development

An interstate natural gas pipeline runs through the site, supported by Nicor looped and back-fed service. This configuration supports potential behind-the-meter generation, enabling a bridge-to-grid strategy and potential early operations as soon as 2028.

Ready to Accelerate Your Data Center Timeline?

If you are evaluating new markets, power-constrained regions, or phased campus growth, Karis can help you move faster with less risk.